Case Studies

Award-Winning
Projects in the Bay

From waterfront environmental remediation to major transit infrastructure, each project showcases Giron's commitment to precision, safety, and delivery.

India Basin Shoreline Park construction
Heavy Civil and Environmental · San Francisco, CA

India Basin
Shoreline Park

Giron Construction is performing comprehensive demolition, earthwork, and mass grading operations for this major waterfront redevelopment in San Francisco. The project transforms a former industrial site into a resilient public shoreline park, requiring precise coordination with environmental controls, ongoing remediation efforts, and multiple agencies.

The project presented unique challenges including variable subsurface conditions such as buried concrete, historical fill, and environmentally sensitive soils, all within a tidal influence zone. Giron implemented adaptive excavation strategies and phased sequencing to maintain schedule while meeting strict regulatory and public safety requirements.

Project Type
Heavy Civil and Environmental
Owner
City and County of San Francisco
Site Area
Approx. 8 Acres
Earthwork Volume
50,000+ Cubic Yards
Timeline
2025 to 2027
Safety Record
Zero Environmental Incidents
Scope of Work
  • Full site demolition and removal of buried obstructions
  • Mass grading and structural excavation to design subgrades
  • Controlled handling and off-haul of impacted soils and debris
  • SWPPP Best Management Practices (BMPs) implementation
  • Final grading and site stabilization for downstream construction
Zero Environmental Incidents 100% HAZWOPER Certified Class II Asbestos Trained
VTA BART Silicon Valley Phase II earthwork
Earthwork and Utilities · Santa Clara County, CA

VTA BART Silicon Valley
Phase II, West Portal

Giron Construction completed large-scale earthwork, structural fill placement, and underground utility installation at the West Portal site in support of the VTA BART Silicon Valley Phase II extension. The scope required managing high-volume material imports and precise soil processing to meet strict geotechnical specifications.

Key challenges included tight trade coordination, complex soil processing and reuse requirements, and limited staging constraints. Giron implemented on-site soil screening and blending, phased work sequencing, and advanced logistics planning to maintain production without compromising quality or safety.

Project Type
Heavy Civil Earthwork and Utilities
Client
VTA, Santa Clara Valley Transportation Authority
Structural Fill Placed
100,000+ Cubic Yards
Material Excavated
13,000+ Cubic Yards
Timeline
April to November 2024
Safety Record
Zero Recordable Incidents
Scope of Work
  • Mass grading and site excavation, 13,000+ CY
  • Structural fill placement and compaction, 100,000+ CY
  • Underground utility installation: industrial water, sanitary sewer, storm drain
  • On-site soil screening and blending to meet geotechnical specifications
  • Virgin aggregate base installation, 10 to 12 inch sections
  • Environmental off-haul of non-RCRA material in full regulatory compliance
Zero Recordable Incidents On Schedule Delivery Public Transit Infrastructure
Oyster Point Park Renovation
Park Construction · South San Francisco, CA

Oyster Point
Park Renovation

Giron Construction is performing comprehensive grading, drainage, and site construction for the Oyster Point Park Renovation in South San Francisco — a large-scale transformation of a former industrial waterfront into a vibrant public park and open space along the Bay.

The scope includes mass grading, storm drainage installation, pathway and trail construction, shoreline stabilization, and site furnishings coordination. Giron is managing all civil improvements in close coordination with the City of South San Francisco and environmental oversight agencies to deliver a landmark public amenity on schedule and within budget.

The scope included precision excavation, structural fill placement, and wet and dry utility installation across multiple phases all delivered on time and within budget in one of the most complex construction environments in the city.

Project Type
Civil and Underground Utilities
Location
Downtown San Francisco, CA
Scope
Multi-Phase Utility Installation
Delivery
On Time and On Budget
Scope of Work
  • Precision excavation in an active urban corridor
  • Structural fill placement across multiple phases
  • Wet and dry underground utility installation
  • Multi-agency coordination with prime contractors and city representatives
  • Strict safety compliance in a high-density urban environment
On Budget On Schedule Urban Infrastructure
Work With Us

Have a Project in Mind?

Our team is ready to bring the same precision and commitment to your next project. Reach out and let us show you what Giron can do.

Start a Conversation